Toilet renovation: where to Begin
The bathroom is a room with special terms: high humidity, humidity differences. That is why making repairs in the restroom, you should clearly plan the entire working process, to think about the sequence of steps to be performed. In the following article, you will discover the way to start the repair in the restroom and what sorts of work ought to be carried out together with your own hands. Step-by-step directions for bathroom repair
Phase 1: Establishing a strategy and deciding upon a layout solution.
Fix in the toilet can be of two types:
- Unplanned, spontaneous, originating from the can of unexpected circumstances. By way of example, in case of an pipe burst, flooding with neighbors.
- Planned, which is either capital or cosmetic. It requires planning, serious monetary investment and time.
Begin repairs at the bathroom is to determine the design, interior. Think through to the last detail, what’s going to be the space, pick a color. Pastel colours are traditional, in addition to a combination of blue and blue, pink or cherry with beige.
Begin repairs in the toilet is to find out the design, interior design. Consider detail, what will be the space, choose a colour. Pastel colours are thought to be traditional, as well as a combo of colors.
Next point is that the selection of facing substance. Generally, finishing at the toilet is done with tile, porcelain tiles, mosaicand plastic panels. Check the pipes, whether it has to be replaced. If needed, pick an appropriate alternative. Proceed to the measuring work: step all sides, calculate the area of the area. Based on these information, we indicate the location of these plumbing fixtures vsyakuhnya.ru.
Step 2: the selection of sanitary fittings and material for completing.
It’s crucial to realize that the purchase price of sanitary ware precedes the planning stage, and not vice versa. This means that first we develop a design project, make a plan, then go to the shop. Another thing – you should specify the size of your favourite plumbing fixtures and check the program, whether it matches.
It’s important to realize that the purchase of plumbing fittings is completed by a preparation period, rather than vice versa. This usually means that first we develop a new design project, create a plan, and then go to the store. Another one
In terms of materials for completing, it’s preferable to get them immediately for the entire repair cycle, in order that then you won’t be diverted if something was missing. Do not forget about preparing the vital tools.
Measure 3: dismantling plumbing and tiling.
After all the preliminary work has been completed, move on to the Start of the task process:
- Remove the sink and bathtub from the room, even though they won’t be replaced with fresh ones. This manner, you can keep them clean and intact.
- Remove the old tile, cleaning following it all of surfaces: ceiling, walls, floor.
- Remove paint from the walls, if they were formerly painted, because the adhesive alternative or a fresh layer of paint won’t adhere to surface.
Step 4: replacement of communications: pipes, electrical wiring.
Very often in an old house, you ought to carefully inspect and replace not only the pipes which are in the bathroom itself, but in addition the major riser, and sometimes the interfloor pipes. What’s it worth doing this? Old pipes at any time can give a flow, and then the new fix will be emptied, it will require additional investment to get rid of defects.